• Slope Deformation At KM 22.9 Of Georgian Railway Modernization


    • Location: Zvare

    • Client: ERYUAN (Constant Department (Branch) of China Railway 23rd Bureau Group Co., LTD)

    • Continous Coring: 350.5m

    • Inclinometer installation: 5 BHs (10 measurements per each BHs)